Warp 9 Tubeless Forged Supermoto Wheels with Tires
(Tubeless Solid Wheels not Spoked Wheels)
SET INCLUDES: (NOT SURE WHAT OPTIONS YOU NEED? VISIT OUR FAQ PAGE FOR ANSWERS!)
- 17x3.5 Front & 17x4.25 or 17x5.0 Rear
- 3 Styles to choose from; Rogue, Stiletto, or Switch (Style comparison available in photos)
- Tubeless Wheels are Machine Forged Aluminum
- Hubs can be changed out to future bike changes or just different colors for an new look
- Front Rotor is the Warp9 320mm Apex Floating Rotor and Includes Caliper Relocation Bracket (NOTE: KTM 690, Husqvarna 701, and GasGas ES700 come with an OEM size 300mm floating wave-style rotor and no bracket. No caliper relocation required!)
- Rear wheel is cush drive and comes with carrier/sprocket and cushions (Except on WR250R & CRF250L, those will come Direct Drive)
- 7075 T6 Black Aluminum Warp 9 Sprocket; 40-45 & 47-52 Tooth
- Includes a 90 degree valve stem (your choice of color)
- Tubeless design offers further weight savings and complexity over spoke wheels
- Front wheel without rotor is 10lbs 2 oz
- Rear wheel is Cush drive and is 15lbs (excluding rotor and sprocket)
- Tires will come mounted and balanced and ready to install on the bike!
- Spacers included when applicable (If your wheels DO NOT come with spacers it simply means you need to use your stock spacers)
- Supermoto Fenders available for purchase here
- Shortened supermoto kickstands available for some models by clicking here
- Brake Pads can be added to your order by clicking here
- Front sprockets can be added, visit here
- NOTE: WR250R wheels come direct drive not cush. 5" rear rims are too wide for the CRF250L & WR250R
- FRONT FORK GUARDS MAY REQUIRE MODIFICATION OR REMOVAL TO ACCOMMODATE STREET/SUPERMOTO WHEELS. Many forums have information on doing so. Here are a few; Supermoto Junkie Thumper Talk
These wheels are custom built-to-order and build times vary significantly depending on the time of year, color options chosen, hub and rim availability, etc. Many parts are anodized or powder coated when ordered and the lead time generally depends on this. Build time can range from 2 to 8 weeks and even reach 10-12 during peak season. We strive very hard to ensure this is the exception and not the rule but a lot of it is out of our control and due to supply and demand. Please review our terms and conditions during checkout for further details. We will notify you via email if your order is going to be longer than the standard turn around time. Please note: when checking your order status it will show as "Awaiting Fulfillment" during the build process. Just know this means your order has been sent to the build team and is in the queue waiting for parts and/or it's turn to be built. This will stay the same until they are ready to ship at which time your order will update to shipped and you will receive an email with the tracking number. If at any time you need assistance feel free to contact us.